Engineering review required

The calculator implements the supplied constant-Cd equations and liquid RHG method. Results must be reviewed by a qualified engineer for the actual operating conditions, installation geometry, methodology limits and applicable design requirements. Preliminary plate-thickness screening is not a final structural or buckling certification. Wet steam is not supported by this single-phase orifice model.

Read product FAQs